E02D - CPC Classification
Classification description:
Sub-classes:
- E02D1/00 » Investigation of foundation soil in situ 50
- E02D11/00 » Methods or apparatus {specially adapted} for both placing and removing sheet pile bulkheads, piles, or mould-pipes 84
- E02D13/00 » Accessories for placing or removing piles or bulkheads, {e.g. noise attenuating chambers} 93
- E02D15/00 » Handling building or like materials for hydraulic engineering or foundations 4
- E02D17/00 » Excavations; Bordering of excavations; Making embankments 28
- E02D19/00 » Keeping dry foundation sites or other areas in the ground 47
- E02D2200/00 » Geometrical or physical properties 2
- E02D2220/00 » Temporary installations or constructions 38
- E02D2250/00 » Production methods 59
- E02D23/00 » Caissons; Construction or placing of caissons 22
- E02D2300/00 » Materials 28
- E02D2450/00 » {Gaskets} 14
- E02D25/00 » Joining caissons, sinkers, or other units to each other under water 13
- E02D2600/00 » Miscellaneous 23
- E02D27/00 » Foundations as substructures 69
- E02D29/00 » underground or underwater structures {Independent} ; Retaining walls 26
- E02D3/00 » Improving or preserving soil or rock, e.g. preserving permafrost soil 102
- E02D31/00 » Protective arrangements for foundations or foundation structures ; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution 70
- E02D33/00 » Testing foundations or foundation structures 92
- E02D35/00 » Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations 72
- E02D37/00 » Repair of damaged foundations or foundation structures 107
- E02D5/00 » Bulkheads, piles, or other structural elements specially adapted to foundation engineering 15
- E02D7/00 » Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds 92
- E02D9/00 » Removing sheet piles bulkheads, piles, mould-pipes or other moulds {or parts thereof} 11