ClassID:

182442

G05B2219/31461 - CPC Classification

Classification description:

Program-control systems; Nc systems; From computer integrated manufacturing till monitoring Use risk analysis to identify process parts that should be specially monitored

Recent Application in this class:
#1
20240272605
2024-08-15

ASSEMBLY VERIFICATION METHOD AND ELECTRONIC DEVICE

#2
20240013119
2024-01-11

SYSTEM AND METHOD FOR RISK BASED CONTROL OF A PROCESS PERFORMED BY PRODUCTION EQUIPMENT

#3
20210365017
2021-11-25

3-D printing batch analysis

#4
20210142240
2021-05-13

System and method for risk based control of a process performed by production equipment

#5
20200143302
2020-05-07

Quantifying, tracking, and anticipating risk at a manufacturing facility based on staffing conditions and textual descriptions of deviations

#6
20200065726
2020-02-27

Integrated business operations efficiency risk management

#7
20190026666
2019-01-24

System and method for risk based control of a process performed by production equipment

#8
20180018213
2018-01-18

Systems and methods for predicting and displaying site safety metrics

#9
20180011451
2018-01-11

MODULAR CONTROL SYSTEM

#10
20160320768
2016-11-03

Computer system and method for causality analysis using hybrid first-principles and inferential model

#11
20120166249
2012-06-28

ASSET MANAGEMENT SYSTEM

#12
20120022671
2012-01-26

Method for determining a safety step and safety manager

#13
20050234581
2005-10-20

Infinitely variable, order specific, holistic assembly process control system

#14
20050222703
2005-10-06

Infinitely variable, order specific, holistic assembly process control system

#15
20050222702
2005-10-06

Infinitely variable, order specific, holistic assembly process control system

#16
20050209724
2005-09-22

Infinitely variable, order specific, holistic assembly process control system

#17
14831733
2017-06-06

Quantifying, tracking, and anticipating risk at a manufacturing facility, taking deviation type and staffing conditions into account