ClassID:

182479

G05B2219/32015 - CPC Classification

Classification description:

Program-control systems; Nc systems; Operator till task planning Optimize, process management, optimize production line

Recent Application in this class:
#1
20260079477
2026-03-19

METHOD AND SYSTEM FOR CONTROLLING THE OPERATION OF A CNC MACHINE FOR MACHINING A WORKPIECE

#2
20260050250
2026-02-19

DEVICE, SYSTEM AND METHOD FOR OPTIMIZING OPERATION OF PRODUCTION EQUIPMENT

#3
20250278081
2025-09-04

BATTERY MANUFACTURING METHOD AND SYSTEM

#4
20250103033
2025-03-27

OPTIMAL CONTROL OF A DISTRIBUTED CIRCULAR MANUFACTURING SYSTEM

#5
20240385605
2024-11-21

SYSTEMS, APPARATUSES, METHODS, AND COMPUTER PROGRAM PRODUCTS FOR MODELING PLANT RECYCLING PROCESSES

#6
20240319714
2024-09-26

APPARATUS AND METHOD FOR MANUFACTURING A DISPLAY APPARATUS

#7
20240168469
2024-05-23

APPARATUSES, COMPUTER-IMPLEMENTED METHODS, AND COMPUTER PROGRAM PRODUCTS FOR IMPROVED BLENDING ELEMENT MODELING

#8
20230409014
2023-12-21

Industrial Bottleneck Detection and Management Method and System

#9
20230341850
2023-10-26

Robot Fleet Management Configured for Use of an Artificial Intelligence Chipset

#10
20230339114
2023-10-26

Digital-Twin-Enabled Robot Fleet Management

#11
20230339108
2023-10-26

Machine-learned robot fleet management for value chain networks

#12
20230315042
2023-10-05

Calculating method for natural frequency of toolholder-tool system of machine tool spindle

#13
20230221705
2023-07-13

DEVICE AND METHOD FOR OPTIMISING THE PROCESS TIME OF A PRODUCTION MACHINE

#14
20230135553
2023-05-04

AI-Managed Additive Manufacturing for Value Chain Networks

#15
20230112656
2023-04-13

DEVICE, SYSTEM AND METHOD FOR OPTIMIZING OPERATION OF PRODUCTION EQUIPMENT

#16
20230103078
2023-03-30

Distributed-Ledger-Based Manufacturing for Value Chain Networks

#17
20230097438
2023-03-30

Robot Fleet Management with Workflow Simulation for Value Chain Networks

#18
20230089330
2023-03-23

Demand-Responsive Robot Fleet Management for Value Chain Networks

#19
20230055428
2023-02-23

METHOD AND SYSTEM FOR OPTIMIZING A MANUFACTURING PROCESS

#20
20230023896
2023-01-26

Method of Transfer Learning for a Specific Production Process of an Industrial Plant

#21
20220357709
2022-11-10

SYSTEM AND METHOD FOR LEGALLY COMPLIANT DOCUMENTATION OF HEALTH AND SAFETY-RELATED PROCESS EVENTS

#22
20220350314
2022-11-03

Management method and management device

#23
20220342401
2022-10-27

SYSTEMS AND METHODS FOR PRODUCTION-LINE OPTIMIZATION

#24
20220318707
2022-10-06

Robot Fleet Resource Configuration in Value Chain Networks

#25
20220305735
2022-09-29

Adaptive Additive Manufacturing for Value Chain Networks

#26
20220276644
2022-09-01

Method for applying an optimized processing treatment to items in an industrial treatment line and associated system

#27
20220236723
2022-07-28

Production assisting device, production system, and recording medium

#28
20220197306
2022-06-23

Job parsing in robot fleet resource configuration

#29
20220197268
2022-06-23

Systems and methods for modeling and controlling building system entities

#30
20220196889
2022-06-23

Variable Focus Liquid Lens Optical Assembly for Value Chain Networks

#31
20220193915
2022-06-23

Robotic Vision System with Variable Lens for Value Chain Networks

#32
20210397167
2021-12-23

PROCESS IMPROVEMENT SUPPORT DEVICE, PROCESS IMPROVEMENT SUPPORT METHOD, AND RECORDING MEDIUM STORING PROCESS IMPROVEMENT SUPPORT PROGRAM

#33
20210390229
2021-12-16

Automated design and optimization for accessibility in subtractive manufacturing

#34
20210356938
2021-11-18

Time-optimized movement guidance between track sections

#35
20210208577
2021-07-08

Automated warehousing system, display panel production line and logistics delivery method

#36
20210173387
2021-06-10

Industrial bottleneck detection and management method and system

#37
20210063987
2021-03-04

Programming apparatus

#38
20200393822
2020-12-17

Additive manufacturing-coupled digital twin ecosystem based on multi-variant distribution model of performance

#39
20200293031
2020-09-17

Central plant control system with plug and play EMPC

#40
20200174457
2020-06-04

As-designed, as-manufactured, as-tested, as-operated and as-serviced coupled digital twin ecosystem

#41
20200174456
2020-06-04

Method and system for optimizing a manufacturing process based on a surrogate model of a part

#42
20200110385
2020-04-09

Apparatus and method for determining a target adjustment route for a preset control condition set of a production line

#43
20190377333
2019-12-12

Checking method, device, and computer program product

#44
20190339677
2019-11-07

Control parameter optimizing system that optimizes values of control parameters of an existing power plant

#45
20190324427
2019-10-24

Model-free online recursive optimization method for batch process based on variable period decomposition

#46
20190286114
2019-09-19

Central plant control system with plug and play EMPC

#47
20190278257
2019-09-12

Apparatus and method thereof for determining a control condition set of a production line

#48
20190243347
2019-08-08

Production management method, production management system, and program

#49
20190099823
2019-04-04

Topology-based spot weld optimization with inter-distance constraints

#50
20180210411
2018-07-26

Control device for a production module, production module having a control device, and method for operating the control device

#51
20180120775
2018-05-03

Multi-agent control system and method

#52
20170357231
2017-12-14

Program generator having function of optimizing machining sequence

#53
20170315540
2017-11-02

Manufacturing adjustment system that adjusts manufacturing statuses of multiple machines

#54
20170052532
2017-02-23

SYSTEM FOR CONTROLLING, MONITORING AND REGULATING PROCESSES IN INDUSTRIAL PLANTS AND A METHOD FOR OPERATING SUCH A SYSTEM

#55
20170003676
2017-01-05

Control parameter optimizing system that optimizes values of control parameters of an existing power plant and operation control optimizing apparatus equipped therewith

#56
20160205822
2016-07-14

Production optimization device of component mounting line

#57
20160132049
2016-05-12

Multi-dimensional resource optimization in the manufacture of three-dimensional elements background

#58
20150220863
2015-08-06

Overall equipment effectiveness of a robot cell

#59
20150088294
2015-03-26

ENVIRONMENTAL MONITORING SYSTEM AND METHOD FOR LIQUID CRYSTAL MANUFACTURING APPARATUS

#60
20150066194
2015-03-05

HOST DEVICE AND METHOD FOR OPTIMIZING MACHINING PROCESS OF PRODUCT

#61
20140379117
2014-12-25

Machine tool with thermal displacement correction

#62
20130046404
2013-02-21

Combinatorial process optimization methodology and system

#63
20130042616
2013-02-21

USE OF MOTOR PROTECTION SYSTEM TO ASSIST IN DETERMINING POWER PLANT METRICS

#64
20130036198
2013-02-07

METHOD FOR IMPROVING THE OPERATION OF MACHINES OR APPLIANCES

#65
20120239167
2012-09-20

Economics-based coordination of advanced process control and real-time optimization

#66
20120041573
2012-02-16

DYNAMIC GAIN CONTROLLER AND CONTROL METHOD FOR A CONTROL PLANT

#67
20120035878
2012-02-09

Combinatorial process optimization methodology and system

#68
20110238189
2011-09-29

Method and Apparatus for Controlling a Plant Using Feedback Signals

#69
20100306001
2010-12-02

System and method for dynamic multi-objective optimization of machine selection, integration and utilization

#70
20100287879
2010-11-18

Integrated packaging system architecture

#71
20100256792
2010-10-07

Method of adjusting wafer processing sequence

#72
20100249971
2010-09-30

Component mounting condition determination method

#73
20100241248
2010-09-23

Method and system for optimizing the layout of a robot work cell

#74
20100168896
2010-07-01

METHOD FOR IMPROVING A MANUFACTURING PROCESS

#75
20090149967
2009-06-11

Management system for operation items used in manufacturing

#76
20090037003
2009-02-05

Real-time operating optimized method of multi-input and multi-output continuous manufacturing procedure

#77
20080312999
2008-12-18

Multiple Goal Throughput Analysis

#78
20080148194
2008-06-19

Method and system for process optimization

#79
20070270994
2007-11-22

SYSTEM AND METHOD FOR GENERATING A YIELD MODEL FOR AN INTEGRATED CIRCUIT FABRICATION PROCESS AND METHOD OF MANUFACTURING AN INTEGRATED CIRCUIT USING THE YIELD MODEL

#80
20070118236
2007-05-24

Method for improving a manufacturing process

#81
20070093925
2007-04-26

Processes for improving production of a work machine

#82
20060136085
2006-06-22

System and method for optimization of product throughput

#83
20050071103
2005-03-31

Yield/quality improvement using calculated failure rate derived from multiple component level parameters

#84
20050033466
2005-02-10

Creation and display of indices within a process plant

#85
20050010308
2005-01-13

Method for improving a manufacturing process

#86
15352241
2020-06-09

Optimization of production systems