ClassID:

182539

G05B2219/32082 - CPC Classification

Classification description:

Program-control systems; Nc systems; Operator till task planning Planing, material requiring planning MRP, request

Recent Application in this class:
#1
20240427318
2024-12-26

SYSTEMS AND METHODS FOR COMPUTER AIDED MATERIAL PROCESSING USING AN INTEGRATED SCANNER

#2
20240369989
2024-11-07

PRODUCT PRODUCTION PLANNING METHOD AND DEVICE, AND STORAGE MEDIUM

#3
20240152115
2024-05-09

MATERIAL MANAGEMENT METHOD AND APPARATUS, COMPUTER DEVICE, AND STORAGE MEDIUM

#4
20240045398
2024-02-08

TECHNIQUES TO DETERMINE A HYBRID MANUFACTURING PLAN

#5
20230393563
2023-12-07

RESOURCE MANAGEMENT SYSTEM AND ADDITIVE MANUFACTURING FACILITY WITH SUCH

#6
20220236720
2022-07-28

INTELLIGENT MANUFACTURING SYSTEM

#7
20190369602
2019-12-05

COMMON CONTROL MODULE SYSTEM

#8
20190299530
2019-10-03

Three dimensional printing system adaptable to varying resin types

#9
20180314237
2018-11-01

System and methods for managing changes to a product in a manufacturing environment including a minor model relational design

#10
20180150796
2018-05-31

Injection molding management system

#11
20170227951
2017-08-10

Material recommendation apparatus

#12
20170199516
2017-07-13

System and methods for managing changes to a product in a manufacturing environment including an anytime design check

#13
20160224022
2016-08-04

Harness sub-assembly rationalization

#14
20160098034
2016-04-07

Engineering change management system

#15
20160048126
2016-02-18

Generating work product plans specifying proportions of constituents to be used in forming a work product

#16
20100249970
2010-09-30

PLANNING APPARATUS, PLANNING METHOD AND PLANNING PROGRAM

#17
20080046106
2008-02-21

Production management program, production management method, and production management system

#18
20060190096
2006-08-24

Evaluation implement of environmental load and evaluation program of environmental load

#19
20060053068
2006-03-09

Method and devices for automatically supplying material to a processing machine

#20
20050177273
2005-08-11

Material supply system in semiconductor device manufacturing plant

#21
20050131779
2005-06-16

Production scheduling system

#22
20050090933
2005-04-28

Robot system using virtual world

#23
18741035
2025-12-09

Controlled activation of interdependent bindings