ClassID:

182692

G05B2219/32252 - CPC Classification

Classification description:

Program-control systems; Nc systems; Operator till task planning Scheduling production, machining, job shop

Recent Application in this class:
#1
20260111014
2026-04-23

UNMANNED INTELLIGENT STAMPING SYSTEM AND STAMPING METHOD

#2
20260023368
2026-01-22

FLEXIBLE JOB-SHOP PRODUCTION SCHEDULING METHOD AND APPARATUS

#3
20250362668
2025-11-27

Rapid-response intelligent scheduling method and system for semiconductor packaging and testing workshop

#4
20250147489
2025-05-08

DUAL-EFFECT SCHEDULING METHOD FOR HETEROGENEOUS ROBOTS IN FLEXIBLE JOB SHOP

#5
20250062144
2025-02-20

PREDICTIVE WAFER SCHEDULING FOR MULTI-CHAMBER SEMICONDUCTOR EQUIPMENT

#6
20240353822
2024-10-24

Run-to-Run Controller for Semiconductor Manufacturing

#7
20240210926
2024-06-27

Material scheduling method and device of semiconductor processing equipment

#8
20240055284
2024-02-15

Predictive wafer scheduling for multi-chamber semiconductor equipment

#9
20230409013
2023-12-21

METHOD AND SYSTEM FOR SYNCHRONIZING PLURALITY OF EVENTS IN AN ASSEMBLY LINE

#10
20230324891
2023-10-12

METHOD AND SYSTEM FOR AUTONOMOUS PRODUCTION DEVICE MODELING FOR JOB PLANNING IN A PRODUCTION ENVIRONMENT

#11
20230266742
2023-08-24

DISPLAY SYSTEM, DISPLAY METHOD, AND COMPUTER-READABLE STORAGE MEDIUM STORING A DISPLAY PROGRAM

#12
20230166452
2023-06-01

SELF-REPAIRING 3D PRINTER

#13
20230066892
2023-03-02

Production schedule estimation method and system of semiconductor process

#14
20220413475
2022-12-29

MANUFACTURING FACILITY AND MANUFACTURING METHOD

#15
20220397893
2022-12-15

System and method for industrial automation device library

#16
20220350316
2022-11-03

INFORMATION PROCESSING DEVICE, WORK PLAN DETERMINATION METHOD, AND STORAGE MEDIUM

#17
20220281049
2022-09-08

AUTOMATED PRODUCTION STATION AND RELATED METHODS

#18
20220250843
2022-08-11

Warehousing control system and computer device

#19
20220187807
2022-06-16

Material processing path selection method and device

#20
20220147027
2022-05-12

Cell controller

#21
20220011757
2022-01-13

Laser Machine Automatic Operating Method and System

#22
20210366749
2021-11-25

Predictive wafer scheduling for multi-chamber semiconductor equipment

#23
20210096554
2021-04-01

System and method for industrial automation device library

#24
20210011462
2021-01-14

Scheduler, substrate processing apparatus, and substrate conveyance method

#25
20200140197
2020-05-07

Warehousing control system and computer device

#26
20190310615
2019-10-10

METHOD AND SYSTEM FOR TRANSPORTING ORDER

#27
20190302787
2019-10-03

Item transport system and method combining storage with picking

#28
20190271970
2019-09-05

Scheduler, substrate processing apparatus, and substrate conveyance method

#29
20190265682
2019-08-29

Process control device, manufacturing device, process control method, control program, and recording medium

#30
20190227533
2019-07-25

Method and apparatus for dynamic intelligent scheduling

#31
20190146463
2019-05-16

Tree search-based scheduling method and electronic apparatus using the same

#32
20180329400
2018-11-15

Material management apparatus and material preparing method

#33
20180314241
2018-11-01

Smart factory for production and quality management of thermoplastic and thermosetting compound

#34
20180203434
2018-07-19

Scheduler, substrate processing apparatus, and substrate conveyance method

#35
20150268660
2015-09-24

Schedule making device, substrate processing apparatus, schedule making program, schedule making method, and substrate processing method

#36
20140025189
2014-01-23

Method for target driven charting in flat sheet industries

#37
20120290114
2012-11-15

System and method for cycle time visualization

#38
20100318209
2010-12-16

Flexible job preparation and control

#39
20100179677
2010-07-15

PRODUCTION OPERATION MANAGEMENT SYSTEM

#40
20090012641
2009-01-08

Method of real-time scheduling of processes at distributed manufacturing sites

#41
20080300705
2008-12-04

Integration of job shop scheduling with discreet event simulation for manufacturing facilities

#42
20080294279
2008-11-27

System and method for handling a production disturbance/opportunity event in a production execution system

#43
20080140439
2008-06-12

Method and apparatus for analyzing the variable operating rate of a manufacturing process

#44
20080004739
2008-01-03

Combining automated and manual information in a centralized system for semiconductor process control

#45
20070112451
2007-05-17

Glass demand scheduling system

#46
20050043838
2005-02-24

Glass production sequencing