248878 ⎘
Fluid handling; With repair, tapping, assembly, or disassembly means Blow out preventer or choke valve device [e.g., oil well flow controlling device, etc.]
BOP PISTON BOOSTER AND BONNETT ASSEMBLY
#2Well-based potential energy conversion systems and methods
#3Well-based potential energy conversion systems and methods
#4Smart choke valve to assess and regulate production flow
#5No-bolt latching system
#6BOP booster piston assembly and method
#7Blowout preventer systems and methods
#8Annular blowout preventer
#9BOP booster piston assembly and method
#10Internal blow out preventer
#11Method and system for testing a multiplexed BOP control system
#12Internal blow out preventer
#13Emergency subsea wellhead closure devices
#14Method and systems for using a shim plate for increased strength
#15GAS PIPE SYSTEM AND A PIPE COMPONENT PROVIDED WITH A BREAK PLATE FOR USE IN SUCH A GAS PIPE SYSTEM
#16Wellsite replacement system and method for using same
#17System and method for providing additional blowout preventer control redundancy
#18Annular BOP packing unit
#19METHOD OF DESIGNING BLOWOUT PREVENTER SEAL USING FINITE ELEMENT ANALYSIS
#20SEAL FOR BLOWOUT PREVENTER WITH SELECTIVE DEBONDING
#21Revised cure cycle for annular packing units
#22Blowout preventer with breech assembly
#23Method and apparatus for a choke valve and operation of a choke valve
#24Method and apparatus for a choke valve and operation of a choke valve
#25Method and apparatus for a choke valve and operation of a choke valve