Inventor profile of:

Thomas J. Boone

City:

Calgary

Country:

Canada

Published Applications:

22

Last publication date:

2017-03-09

Top Assignees for applications by Thomas J. Boone

The entities that hold a legal rights for patent applications filed by inventor Boone Thomas J.:

Recent patent applications by Boone Thomas J.

Thomas J. Boone from Calgary, CA has applied for patents for these inventions. The list has both pending applications and granted patents:

#1 | 2017-03-09
US20170067331A1
Fixed constructions

Recovery from a hydrocarbon reservoir

#2 | 2017-03-09
US20170067330A1
Fixed constructions

Recovery from a hydrocarbon reservoir

#3 | 2016-01-07
US20160003017A1
Fixed constructions

Producing hydrocarbons from a formation

#4 | 2015-04-23
US20150107833A1
Fixed constructions

Recovery From A Hydrocarbon Reservoir

#5 | 2015-03-12
US20150068750A1
Fixed constructions

Recovery from a hydrocarbon reservoir

#6 | 2015-02-26
US20150053401A1
Fixed constructions

Systems and Methods for Enhancing Production of Viscous Hydrocarbons From a Subterranean Formation

#7 | 2015-01-15
US20150013969A1
Fixed constructions

SYSTEMS AND METHODS FOR IMPROVING RESERVOIR FLUID RECOVERY FROM FRACTURED SUBTERRANEAN FORMATIONS

#8 | 2014-12-25
US20140374582A1
Physics

Azimuthal cement density image measurements

#9 | 2014-09-18
US20140262240A1
Fixed constructions

Producing Hydrocarbons from a Formation

#10 | 2014-09-18
US20140262239A1
Fixed constructions

Preparing a Wellbore for Improved Recovery

#11 | 2014-06-26
US20140174744A1
Fixed constructions

Systems and Methods For Pressure-Cycled Stimulation During Gravity Drainage Operations

#12 | 2014-03-27
US20140083706A1
Fixed constructions

Methods and Systems for Providing Steam

#13 | 2014-03-27
US20140083694A1
Fixed constructions

Methods and Systems for Providing Steam

#14 | 2013-01-03
US20130000898A1
Fixed constructions

Dual Mobilizing Agents In Basal Planer Gravity Drainage

#15 | 2013-01-03
US20130000896A1
Fixed constructions

Basal Planer Gravity Drainage

#16 | 2012-12-27
US20120325467A1
Fixed constructions

Method of Controlling Solvent Injection To Aid Recovery of Hydrocarbons From An Underground Reservoir

#17 | 2011-12-01
US20110295771A1
Fixed constructions

Method of distributing a viscosity reducing solvent to a set of wells

#18 | 2011-12-01
US20110290503A1
Fixed constructions

Well completion for viscous oil recovery

#19 | 2011-12-01
US20110290488A1
Fixed constructions

Creation of a hydrate barrier during in situ hydrocarbon recovery

#20 | 2011-11-10
US20110272153A1
Fixed constructions

Method and System For Enhancing A Recovery Process Employing One or More Horizontal Wellbores

#21 | 2010-09-02
US20100218954A1
Fixed constructions

Methods for application of reservoir conditioning in petroleum reservoirs

#22 | 2010-06-24
US20100155062A1
Fixed constructions

Use of a heavy petroleum fraction as a drive fluid in the recovery of hydrocarbons from a subterranean formation

InventorID:

2085 ⎘