Inventor profile of:

Sina KHATIBI

City:

Munich

Country:

Germany

Published Applications:

20

Last publication date:

2026-05-14

Top Assignees for applications by Sina KHATIBI

The entities that hold a legal rights for patent applications filed by inventor KHATIBI Sina:

Recent patent applications by KHATIBI Sina

Sina KHATIBI from Munich, DE has applied for patents for these inventions. The list has both pending applications and granted patents:

#1 | 2026-05-14
US20260136416A1
Electricity

METHOD AND APPARATUS RELATED TO DUAL CONNECTIVITY MEASUREMENTS

#2 | 2026-01-29
US20260031921A1
Electricity

METHOD, APPARATUS AND COMPUTER PROGRAM

#3 | 2025-12-04
US20250374153A1
Electricity

CONFIDENCE-BASED ADVANCED TRAJECTORY PREDICTION

#4 | 2025-02-20
US20250063455A1
Electricity

UE POSITIONING/LOCATION ASSISTED CONDITIONAL HANDOVER

#5 | 2025-02-20
US20250063431A1
Electricity

APPARATUS, METHODS, AND COMPUTER PROGRAMS FOR PREDICTING NETWORK PERFORMANCE BEFORE TRIGGERING HANDOVER

#6 | 2025-02-13
US20250056343A1
Electricity

MOBILITY ROBUSTNESS OPTIMIZATION

#7 | 2024-12-19
US20240422643A1
Electricity

EARLY DETECTION OF FAST MASTER CELL GROUP RECOVERY FAILURE

#8 | 2024-12-05
US20240406809A1
Electricity

HANDOVER CONTROL

#9 | 2024-10-31
US20240365197A1
Electricity

SEPARATING FIXABLE AND UNFIXABLE HANDOVER KPIS FOR IMPROVED MOBILITY ROBUSTNESS

#10 | 2024-10-17
US20240348508A1
Electricity

METHOD AND APPARATUS FOR FEASIBILITY CHECKING OF AI PIPELINE TRUSTWORTHINESS

#11 | 2024-08-15
US20240275690A1
Electricity

APPARATUS, METHOD AND COMPUTER PROGRAM

#12 | 2024-07-11
US20240236721A9
Electricity

METHOD FOR PREDICTING ADVERSE OPERATING CONDITIONS

#13 | 2024-06-06
US20240187945A1
Electricity

MOBILITY OPTIMIZATION CONTROL

#14 | 2024-05-02
US20240147339A1
Electricity

USE OF ESTIMATED ARRIVAL PROBABILITY-RELATED INFORMATION TO SELECT TARGET SECONDARY NODES FOR EARLY DATA FORWARDING FOR DUAL CONNECTIVITY WIRELESS COMMUNICATIONS

#15 | 2024-04-25
US20240137787A1
Electricity

METHOD FOR PREDICTING ADVERSE OPERATING CONDITIONS

#16 | 2024-04-11
US20240119365A1
Physics

FEEDBACK FOR MACHINE LEARNING BASED NETWORK OPERATION

#17 | 2024-04-04
US20240113796A1
Electricity

AI/ML CONFIGURATION FEEDBACK

#18 | 2024-03-07
US20240080727A1
Electricity

Measurement Adjustment in Low Mobility

#19 | 2024-02-29
US20240073770A1
Electricity

LMF ASSISTED MRO

#20 | 2022-11-10
US20220360313A1
Electricity

Beam group specific mobility robustness optimization

InventorID:

5573355 ⎘