Munich
Germany
23
2025-12-04
The entities that hold a legal rights for patent applications filed by inventor GURSU Halit Murat:
Halit Murat GURSU from Munich, DE has applied for patents for these inventions. The list has both pending applications and granted patents:
RADIO INTERFACE MEASUREMENTS
#2 | 2025-07-10Apparatuses, Methods, and Computer Programs for Temporarily Unavailable Network Slices
#3 | 2025-05-01RANDOM ACCESS PROCEDURE OPTIMIZATION FOR ENERGY HARVESTING SDT DEVICES
#4 | 2025-04-03Energy-efficient and RRC state aware radio resource allocation
#5 | 2025-02-06SECURITY KEY MANAGEMENT IN DUAL CONNECTIVITY OPERATION
#6 | 2024-10-10HANDLING OF TIMING ADVANCE ACQUISITION FAILURE IN L1/2 TRIGGERED INTER-CELL MOBILITY
#7 | 2024-10-10RANDOM ACCESS CONFUSION AVOIDANCE
#8 | 2024-10-10DELTA CONFIGURATION FOR CONDITIONAL HANDOVER CONFIGURATIONS
#9 | 2024-08-22AVOIDING CHO CANCELLATION OR RE-INITIALISATION IN CASE OF SCG RECONFIGURATION
#10 | 2024-08-15METHODS AND APPARATUSES RELATING TO REPORTING OF USER PLANE INTERRUPTION TIMES
#11 | 2024-06-27MOBILITY CONTROL IN CONNECTION OF NETWORK SLICES
#12 | 2024-06-27PHYSICAL CELL IDENTITY COLLISION RESOLUTION FOR WIRELESS NETWORKS
#13 | 2024-06-20ROBUST MOBILE TERMINAL HANDOVER
#14 | 2024-05-16Triggering of Low Layer Mobility Through Inter Cell Beam Management Procedure
#15 | 2024-05-09Fallback Conditional Handover Configuration with Single Connectivity
#16 | 2024-04-11Timing Advance Triggering Measurement Report For FR2 Handover
#17 | 2023-12-21Dynamic UE Signal Level Correction for Measurement Modification and/or Stationarity Detection
#18 | 2023-06-15Dynamic random access occasion configuration after a contention
#19 | 2023-02-09Temporary bandwidth part switch suitable for reduced capability device
#20 | 2023-02-09Enhanced multi-panel user equipment measurement for improved mobility robustness
#21 | 2022-12-15Policy-Based Resource Pool Allocation for Low-Latency IIOT and Other Applications
#22 | 2022-10-27Conditional handover (CHO) execution with network slice service continuity prioritization
#23 | 2022-09-22Conditional proactive discontinuous reception (DRX) measurement
5605849 ⎘