Feldbach
Austria
72
2025-12-25
The entities that hold a legal rights for patent applications filed by inventor Vesely Alexander:
Alexander Vesely from Feldbach, AT has applied for patents for these inventions. The list has both pending applications and granted patents:
5G MULTICAST BROADCAST SERVICE HANDOVER
#2 | 2025-06-19Methods and Devices for Session Release
#3 | 2025-03-06HETEROGENEOUS SLICE DEPLOYMENT WITHIN A REGISTRATION AREA OF A CELLULAR COMMUNICATIONS NETWORK
#4 | 2024-09-19HANDLING SERVICE DATA APPLICATION PROTOCOL (SDApP) END MARKERS AT HANDOVER
#5 | 2024-07-11SECONDARY NODE CHANGE MEASUREMENT SIGNALING IN NEXT GENERATION RADIO NETWORK
#6 | 2024-05-23Methods, Apparatus and Computer-Readable Media Relating to Multicast Broadcast Services in a Communication Network
#7 | 2024-03-28User Equipment, Network Node and Methods Therein
#8 | 2023-12-14Method, Apparatus and Computer Program Product for Providing Service Continuity for Multicast and Broadcast Service
#9 | 2023-11-30First Network Node, Second Network Node and Methods in a Wireless Communications Network
#10 | 2023-11-09TRACKING AREA UPDATE PROCEDURE FOR NTN
#11 | 2023-11-095G MULTICAST BROADCAST SERVICE HANDOVER
#12 | 2023-10-12EARTH-FIXED CELL ID FOR NON-TERRESTRIAL NETWORKS
#13 | 2023-09-07Secondary node change measurement signaling in next generation radio network
#14 | 2023-06-22QUALITY OF SERVICE MANAGEMENT IN A TELECOMMUNICATIONS NETWORK
#15 | 2023-03-30RAN-5GC INTERACTIONS FOR SESSION JOIN, SESSION START, SESSION LEAVE, SESSION STOP, AND SESSION DELETE FOR 5G MULTICAST BROADCAST SERVICES
#16 | 2023-03-09FIRST NETWORK NODE, SECOND NETWORK NODE, THIRD NETWORK NODE AND METHODS PERFORMED THEREBY, FOR HANDLING A MEASUREMENT CONFIGURATION
#17 | 2022-11-10Methods providing transmission of UL data to a source access node after establishing connection with a target access node and related wireless devices
#18 | 2022-06-30User plane security in split RAN architectures
#19 | 2022-06-23METHODS OF BROADCASTING PUBLIC AND NON-PUBLIC NETWORK LISTS AND RELATED NETWORK NODES AND WIRELESS DEVICES
#20 | 2022-06-02Handling QoS mobility and dual connectivity in NR
#21 | 2022-04-28Data volume reporting in 5GS
#22 | 2022-01-06Methods, wireless device, network node and core node for managing reachability of the wireless device
#23 | 2021-12-23Handling service data application protocol (SDApP) end markers at handover
#24 | 2021-12-23Method to manage downlink data delivery status
#25 | 2021-11-11Redirection mechanism to support network sharing/slicing with CU-DU split
#26 | 2021-11-04Methods, apparatus and systems relating to UE inactivity
#27 | 2021-10-21Nodes and method for handling message delivery to a UE
#28 | 2021-04-29RACE CONDITION AVOIDANCE BETWEEN MASTER BASE STATION INITIATED SECONDARY BASE STATION RELEASE AND SECONDARY BASE STATION INITIATED SECONDARY BASE STATION CHANGE PROCEDURES
#29 | 2021-01-07Handling application protocol identity for a UE-associated logical connection
#30 | 2021-01-07Secondary node change signaling in future radio networks
#31 | 2020-12-24Handling QoS mobility and dual connectivity in NR
#32 | 2020-09-24First radio network node (RNN), a second RNN and methods therein for establishing a communications interface between the first RNN and the second RNN
#33 | 2020-09-10Management of uplink bitrates
#34 | 2020-09-03Notification control over RAN interfaces
#35 | 2020-08-06Handling dual connectivity in new radio
#36 | 2020-07-16Method to manage downlink data delivery status
#37 | 2020-05-14Race condition avoidance between master base station initiated secondary base station release and secondary base station initiated secondary base station change procedures
#38 | 2020-04-235G QoS flow to radio bearer remapping
#39 | 2020-03-12Radio link management in a split RAN architecture
#40 | 2020-03-12Methods, apparatus and systems relating to data radio bearer inactivity
#41 | 2020-02-20Secondary node change signaling in future radio networks
#42 | 2020-02-20Methods and arrangements for transferring management of wireless devices between core network nodes of a wireless communication network
#43 | 2020-01-23Race condition avoidance between master base station initiated secondary base station release and secondary base station initiated secondary base station change procedures
#44 | 2019-11-28Interface Setup Between A Radio Access Network And A Core Network
#45 | 2019-08-22Secondary node change measurement signaling in next generation radio network
#46 | 2019-08-01RADIO ACCESS NETWORK NODE AND A CORE NETWORK NODE FOR PAGING A WIRELESS DEVICE IN A WIRELESS COMMUNICATION NETWORK
#47 | 2019-03-14First radio network node (RNN), a second RNN and methods therein for establishing a communications interface between the first RNN and the second RNN
#48 | 2019-01-03Methods, wireless device, network node and core node for managing reachability of the wireless device
#49 | 2019-01-03Methods and network node for activation of connection configuration for a secondary base station
#50 | 2018-12-20Radio network nodes management system providing dual connectivity
#51 | 2018-08-23Technique For Multi-Connectivity
#52 | 2018-07-05Methods, source network node and target network node for handover of a wireless communication device
#53 | 2018-05-03PDCP and flow control for split bearer
#54 | 2018-02-01Method and device for resumption of RRC state in cellular network
#55 | 2017-12-28Mobility signalling for user equipment using dual connectivity
#56 | 2017-02-02Method Between Two eNBs to Agree on Radio Resource Configuration for a UE Which Supports Dual Connectivity Between the eNBs
#57 | 2016-12-22Network Nodes and Methods Therein for Handover for Dual Connectivity
#58 | 2016-09-01Methods and arrangements for managing a communication interface between the base stations
#59 | 2016-01-28A Master and Second Evolved Node B and Method Performed Thereby for Modifying a Radio Resource of the SENB with Respect to a UE Currently Being Connected to the MENB
#60 | 2016-01-21Bearer configuration signaling
#61 | 2015-11-12PDCP and flow control for split bearer
#62 | 2015-01-29Signalling Interfaces in Communications
#63 | 2015-01-15Allocation of identifiers for home node Bs
#64 | 2014-10-23Method of management in a communications network
#65 | 2014-07-24Gateway functionality for mobile relay system
#66 | 2011-08-04Transmission of a synchronization signal within a cellular telecommunication network with temporarily increased transmitting power
#67 | 2011-02-24Method for recovering connectivity in the event of a failure in a radio communications system and controlling node thereof
#68 | 2010-12-02Coverage of private base station
#69 | 2010-08-05Accessibility of private base station
#70 | 2010-07-22TRANSMISSION OF USEFUL AND CONTROL INFORMATION DURING SOFT HANDOVER
#71 | 2010-07-22Private base station and radio network entity
#72 | 2009-04-23Reduced ping pong occurrence during handover
845193 ⎘