ClassID:

128382

E02D3/08 - CPC Classification

Classification description:

Improving or preserving soil or rock, e.g. preserving permafrost soil; Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Recent Application in this class:
#1
20260028790
2026-01-29

METHODS AND APPARATUSES FOR COMPACTING SOIL AND GRANULAR MATERIALS

#2
20250003167
2025-01-02

Systems and Methods to Provide Pressed and Aggregate Filled Concavities for Improving Ground Stiffness and Uniformity

#3
20240401295
2024-12-05

APPARATUSES FOR CONSTRUCTING DISPLACEMENT AGGREGATE PIERS

#4
20240337082
2024-10-10

EXTENSIBLE SHELLS AND RELATED METHODS FOR CONSTRUCTING A DUCTILE SUPPORT PIER

#5
20240254713
2024-08-01

System and Method for Installing an Aggregate Pier

#6
20240084538
2024-03-14

Terrapin System

#7
20240026625
2024-01-25

Methods and apparatuses for compacting soil and granular materials

#8
20230121538
2023-04-20

Vibrator assembly for creating stone columns, and method for creating stone columns

#9
20230101456
2023-03-30

System for and method of stabilizing rail track structures using a load transfer apparatus

#10
20230066115
2023-03-02

System and method for installing an aggregate pier

#11
20230041358
2023-02-09

Extensible shells and related methods for constructing a ductile support pier

#12
20220412034
2022-12-29

Method and apparatus for layer-by-layer filling and compacting cohesive building materials in layers in boreholes

#13
20220380995
2022-12-01

Vibro replacement probe and method for equipping a leader with a vibro replacement probe

#14
20220315882
2022-10-06

EQUAL ENERGY DEFORMATION COMPOSITE FOUNDATION USING MICROORGANISMS TO SOLIDIFY AGGREGATE AND THE CONSTRUCTION METHOD THEREOF

#15
20220136199
2022-05-05

No Vibration Stone Column Drill

#16
20220136198
2022-05-05

Porous displacement piles meeting filter design criteria for rapid consolidation and densification of subsurface soils and intermediate geomaterials

#17
20220025601
2022-01-27

Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity

#18
20210388569
2021-12-16

VIBRATOR ASSEMBLY FOR CREATING STONE COLUMNS, AND METHOD FOR CREATING STONE COLUMNS

#19
20210254302
2021-08-19

High-performance liquefaction-resistance treatment method for gravel pile of existing building foundation

#20
20210164186
2021-06-03

INTERLOCKING STABILIZATION SYSTEM FOR STABILIZING SLOPE, UNRESTRAINED EARTH OR THE LIKE

#21
20210164185
2021-06-03

Methods and apparatuses for compacting soil and granular materials

#22
20210087769
2021-03-25

Extensible shells and related methods for constructing a ductile support pier

#23
20200299917
2020-09-24

Deformation-compliant rigid inclusions with embedded structural reinforcements

#24
20200277748
2020-09-03

Apparatuses for constructing displacement aggregate piers

#25
20200256028
2020-08-13

Cleft-mallet

#26
20200115877
2020-04-16

Extensible shells and related methods for constructing a ductile support pier

#27
20200115857
2020-04-16

System for and method of stabilizing rail track structures using a load transfer apparatus

#28
20200040542
2020-02-06

Foundation treatment method for piling foundation structure by penetrating hardpan layer

#29
20190316312
2019-10-17

Displacement and/or compaction device

#30
20190309494
2019-10-10

Methods and apparatuses for compacting soil and granular materials

#31
20190169813
2019-06-06

Vibrator assembly for creating stone columns, and method for creating stone columns

#32
20190136478
2019-05-09

Method to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity

#33
20190100892
2019-04-04

Mandrel and a method for soil compaction

#34
20190032296
2019-01-31

Pier tool and method of use

#35
20180355573
2018-12-13

Combination pier

#36
20180010313
2018-01-11

DEVICE FOR CONTROLLING BALLAST AND MUD FOR GRAVEL COMPACTED COLUMN PRODUCED BY A WET PROCESS

#37
20170370065
2017-12-28

Hybrid foundation structure, and method for building same

#38
20170306581
2017-10-26

Methods and apparatuses for compacting soil and granular materials

#39
20170159257
2017-06-08

Open-end extensible shells and related methods for constructing a support pier

#40
20170058477
2017-03-02

Mandrel for forming an aggregate pier, and aggregate pier compacting system and method

#41
20170002537
2017-01-05

Filling tube for producing a column of filling material in the ground as well as device and method related thereto

#42
20160312430
2016-10-27

Method and apparatus for making an expanded base pier

#43
20160208452
2016-07-21

Apparatuses for constructing displacement aggregate piers

#44
20160208451
2016-07-21

Methods and apparatuses for compacting soil and granular materials

#45
20160097177
2016-04-07

Machine and a method for making columns in ground

#46
20150330051
2015-11-19

Open-end extensible shells and related methods for constructing a support pier

#47
20150322641
2015-11-12

Modified stone column drill

#48
20150139739
2015-05-21

Hybrid foundation structure, and method for building same

#49
20150104260
2015-04-16

Vibrating arrangement for producing columns of filling material

#50
20140270985
2014-09-18

Apparatus and method for ground improvement

#51
20140056651
2014-02-27

Method of providing a support column

#52
20140023443
2014-01-23

Machine and method for forming an in ground granular column

#53
20140010600
2014-01-09

Soil reinforcement system including angled soil reinforcement elements to resist seismic shear forces and methods of making same

#54
20130322971
2013-12-05

PILE-DRIVING AND EXTRACTION APPARATUS

#55
20130279992
2013-10-24

Extensible shells and related methods for constructing a support pier

#56
20120195692
2012-08-02

Construction modulus testing apparatus and method

#57
20120183361
2012-07-19

Apparatus and method for ground improvement

#58
20120163922
2012-06-28

Shielded tamper and method of use for making aggregate columns

#59
20120093590
2012-04-19

Methods of providing a support column

#60
20120041650
2012-02-16

Method for high capacity stone delivery with concentric flow and enhanced nosecone for soil improvement

#61
20120039674
2012-02-16

Control system for monitoring the flow of air in a high capacity column delivery device

#62
20120039671
2012-02-16

Apparatus for high capacity stone delivery with concentric flow and enhanced nosecone for soil improvement

#63
20110313718
2011-12-22

Construction modulus testing apparatus and method

#64
20110305525
2011-12-15

Method of providing a support column

#65
20110243667
2011-10-06

Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix

#66
20110243666
2011-10-06

Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix

#67
20110064526
2011-03-17

Extensible shells and related methods for constructing a support pier

#68
20110052330
2011-03-03

Method and Apparatus for Making an Expanded Base Pier

#69
20100071309
2010-03-25

SOIL STABILIZATION SYSTEM, STABILIZED SOIL COMPRISING SAME, AND A METHOD OF STABILIZING SOIL

#70
20100028087
2010-02-04

Shielded tamper and method of use for making aggregate columns

#71
20090317188
2009-12-24

Vibrator arrangement and method of producing material columns in the ground

#72
20090277943
2009-11-12

Soil nail launcher

#73
20080205993
2008-08-28

Method and apparatus for creating support columns using a hollow mandrel with upward flow restrictors

#74
20080193223
2008-08-14

Slotted mandrel for lateral displacement pier and method of use

#75
20080159813
2008-07-03

Apparatus for providing a support column

#76
20080101876
2008-05-01

Method to increase a capability of soil to sustain loads

#77
20080101873
2008-05-01

Method and Apparatus For Building Support Piers From One or Successive Lifts Formed In A Soil Matrix

#78
20080031694
2008-02-07

Method of providing a support column

#79
20070267224
2007-11-22

Drilling device and method for producing a drilling column in the soil

#80
20070253782
2007-11-01

Drilling implement and method for installing a drilling pillar in the ground

#81
20070206995
2007-09-06

Apparatus and method for building support piers from one or more successive lifts

#82
20070077128
2007-04-05

Pyramidal or conical shaped tamper heads and method of use for making rammed aggregate piers

#83
20060088388
2006-04-27

Apparatus for providing a rammed aggregate pier

#84
20060008326
2006-01-12

Apparatus to form columns of granular material

#85
20050217539
2005-10-06

Composite of consolidation-hardening pile for soft ground

#86
20050081459
2005-04-21

Foam pile system