ClassID:

128418

E02D5/38 - CPC Classification

Classification description:

Bulkheads, piles, or other structural elements specially adapted to foundation engineering; Piles; Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Sub-classes:
Recent Application in this class:
#1
20260015812
2026-01-15

METHOD FOR FORMING A FOUNDATION PILE IN THE GROUND

#2
20250347077
2025-11-13

Grout Having a Resin-Based System for Anchoring, and Methods Relating Thereto

#3
20250052026
2025-02-13

LATERALLY EXPANDED CAPACITY-ENHANCED PILES AND ANCHORS

#4
20240392524
2024-11-28

Grout Having A Resin-Based System For Anchoring, and Methods Relating Thereto

#5
20240328109
2024-10-03

RADIAL BOLT CORRUGATED PIPE MOLD AND ASSEMBLY FOR CEMENTITIOUS FOUNDATIONS, AND METHOD FOR STABILIZATION

#6
20240318397
2024-09-26

LOST FORMWORK FOR GUIDE WALL FOR PILE WALL CONSTRUCTION

#7
20240093455
2024-03-21

HANDLING DEVICE AND METHOD FOR GRIPPING AND INSERTING A PILE TUBE INTO A BOREHOLE

#8
20230392337
2023-12-07

Anchor Assembly

#9
20230243120
2023-08-03

CONCRETE PIER FOUNDATION WITH LATERAL SHEAR REINFORCING LOOPS AND METHODS OF CONSTRUCTING THE SAME

#10
20230243119
2023-08-03

Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same

#11
20230151575
2023-05-18

Rapid construction device and method for prestressed basalt fiber anchor rod

#12
20230002995
2023-01-05

CONCRETE FORMING TUBE

#13
20220356664
2022-11-10

High-capacity threaded bar micropile and caisson reinforcement compression spacer

#14
20220275600
2022-09-01

Device and method for testing compression amount of pile body of rock-socketed cast-in-place pile

#15
20220145564
2022-05-12

Sheath formed by at least one circular knit for producing a reinforced concrete pile

#16
20210292987
2021-09-23

Construction method for pouring concrete in karst cave

#17
20210285180
2021-09-16

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

#18
20210269999
2021-09-02

System with markers for placing a retaining pile with asymmetrical reinforcement and method for using same

#19
20200308794
2020-10-01

ADJUSTABLE CAP FOR COLUMN FOUNDATION

#20
20200299917
2020-09-24

Deformation-compliant rigid inclusions with embedded structural reinforcements

#21
20200165790
2020-05-28

Variable-diameter reinforcing cage for anchor rod or pile foundation

#22
20200149240
2020-05-14

TOP-TO-BOTTOM CONSTRUCTION SYSTEM

#23
20200087881
2020-03-19

Arc melted glass piles for structural foundations and method of use

#24
20200032476
2020-01-30

Concrete pier foundation with lateral shear reinforcing loops and methods of constructing the same

#25
20190071834
2019-03-07

Method and loading module to mechanically increase pile/drilled shaft end bearing stiffness

#26
20190032297
2019-01-31

Device for building an underwater construction, filter apparatus for a corresponding device and method for building an underwater construction

#27
20180371842
2018-12-27

Drill head for a drilling device for creating drill holes in insufficiently stable foundation

#28
20180320333
2018-11-08

FORMWORK FOR MANUFACTURING A CONCRETE STRUCTURE, FORMWORK SYSTEM FOR FORMING SUCH A FORMWORK AND METHOD FOR MANUFACTURING A CONCRETE STRUCTURE

#29
20180238064
2018-08-23

MODULAR SUPPORT STRUCTURES FOR FLOORS

#30
20170370066
2017-12-28

Drive point for a pile

#31
20170335536
2017-11-23

Method of forming a concrete column utilizing a thermoplastic concrete forming tube

#32
20170284162
2017-10-05

Machine and method for earth-working

#33
20170211252
2017-07-27

Device for obtaining C.G.S injection control chart for seismic retrofitting and controlling quality

#34
20170121926
2017-05-04

In-line battered composite foundations

#35
20160340851
2016-11-24

METHOD FOR INSTALLING METAL PILES IN PERMAFROST SOIL

#36
20160017562
2016-01-21

Rapid pier

#37
20150361633
2015-12-17

Pre-stress corrosion-resistant tubular pile used in special coastal geological conditions and manufacturing method

#38
20150023739
2015-01-22

Drive point for a pile

#39
20140352449
2014-12-04

High strain dynamic load testing procedure

#40
20140255106
2014-09-11

Perimeter pile anchor foundation

#41
20140241816
2014-08-28

Method of making concrete pile sections

#42
20130037979
2013-02-14

Form sleeve for forming concrete footings

#43
20120067650
2012-03-22

Modular system of mutli-purpose rods for drilling soil

#44
20120014755
2012-01-19

METHOD FOR PLACING A PILE OR ANCHORING PILE INTO GROUND

#45
20110048805
2011-03-03

Drilling apparatus and method for working the ground

#46
20100098502
2010-04-22

Socket wrench attachment for rotary drive member

#47
20090116910
2009-05-07

Piling apparatus and method of installation

#48
20090020680
2009-01-22

Concrete forming tube

#49
20080199260
2008-08-21

Caisson tube finishing form

#50
20080019779
2008-01-24

Steel-Cased Concrete Piers

#51
20080008539
2008-01-10

VOID FORM FOR CONSTRUCTING POST-TENSIONED FOUNDATION PILES

#52
20070175136
2007-08-02

Poured concrete column hole

#53
20070166111
2007-07-19

Poured concrete column alignment and plumbing tool

#54
20060269363
2006-11-30

Pier construction support system

#55
20050100416
2005-05-12

Anchor pile apparatus and method of installation

#56
20050031418
2005-02-10

Piling apparatus and method of installation

#57
17543718
2023-12-26

Cased piles

#58
17211593
2022-11-15

Grout plug systems and methods for placing piles

#59
16655131
2020-06-09

Corrugated shell bearing piles and installation methods

#60
15815704
2018-06-19

Casing assembly for forming CIP retaining wall and method for forming CIP retaining walls using the casing assembly